Substation busbars and gantries behind a line of trees
Project Experience

Experience across critical
power infrastructure.

Selected projects demonstrating PCD's experience across
major substation and infrastructure programmes.

Our Projects

Images shown are representative of each project type.

Landulph 400 kV Substation outdoor equipment and busbarsRepresentative image
/01Cornwall, UK

Landulph 400 kV Substation

Power & Energy
Scope

Lead Engineering: Civil, Structural & Design Assurance

/01Cornwall, UK

Landulph 400 kV Substation

Lead Engineering: Civil, Structural & Design Assurance

Landulph is a National Grid substation where works form part of the ongoing expansion of the transmission network, upgrading the grid to support the UK’s shift to clean energy. PCD delivered the majority of the engineering works on the project, from civil engineering through to design assurance, reviewing design packages with site conditions in view to help keep the programme on track.

Navenby 400 kV Substation open-air plant and gantriesRepresentative image
/02Lincolnshire, UK

Navenby 400 kV Substation

Power & Energy
Scope

Lead Engineering: Civil, Structural & Design Assurance

/02Lincolnshire, UK

Navenby 400 kV Substation

Lead Engineering: Civil, Structural & Design Assurance

This new open-air 400 kV substation will help meet growing demand and connect new sources of cleaner power, as part of The Great Grid Upgrade. The scheme includes new access, drainage and landscaping, plus overhead line works terminating on gantries inside the substation. PCD delivered the majority of the engineering works on the project, from civil engineering through to design assurance.

Bicker Fen Substation high-voltage interconnector baysRepresentative image
/03Lincolnshire, UK

Bicker Fen Substation

Power & Energy
Scope

400 kV Substation Civil & Structural Engineering

/03Lincolnshire, UK

Bicker Fen Substation

400 kV Substation Civil & Structural Engineering

National Grid extended its Bicker Fen 400 kV substation to connect the Viking Link interconnector, a 1,400 MW link between the British and Danish transmission systems. The extension added double busbars, a bus coupler and two interconnector bays. PCD delivered civil and structural engineering for the 400 kV works.

West Burton Substation 400 kV transmission infrastructureRepresentative image
/04Nottinghamshire, UK

West Burton Substation

Power & Energy
Scope

400 kV Substation Civil Engineering & Foundations

/04Nottinghamshire, UK

West Burton Substation

400 kV Substation Civil Engineering & Foundations

West Burton holds a notable place in UK grid history: the country’s first 400 kV line ran from West Burton power station to Sundon in Bedfordshire. Ongoing refurbishment of the surrounding network includes new underground cables and high-voltage connections at the substation. PCD provided civil engineering and foundation design for the 400 kV substation.

Wymondley Substation 400 kV GIS equipment and transformer plinthRepresentative image
/05Hertfordshire, UK

Wymondley Substation

Power & Energy
Scope

400 kV GIS Substation Civil & Structural Engineering

/05Hertfordshire, UK

Wymondley Substation

400 kV GIS Substation Civil & Structural Engineering

Wymondley is a key National Grid substation in North Hertfordshire. As part of recent upgrade works, a 120-tonne transformer was moved across the site and positioned onto its final plinth. PCD delivered civil and structural engineering for the 400 kV GIS substation works.

Bulls Lodge 400 kV GIS Substation building and switchgearRepresentative image
/06Essex, UK

Bulls Lodge 400 kV GIS Substation

Power & Energy
Scope

Temporary Works

/06Essex, UK

Bulls Lodge 400 kV GIS Substation

Temporary Works

Bulls Lodge is a substation extension featuring a GIS building and non-SF6 switchgear, connecting new solar generation to the 400 kV network. PCD provided temporary works engineering for the project, supporting safe construction of the GIS buildings and foundations.

Spennymoor 400 kV Substation overhead lines and busbarsRepresentative image
/07County Durham, UK

Spennymoor Substation

Power & Energy
Scope

400 kV Substation Civil & Structural Engineering

/07County Durham, UK

Spennymoor Substation

400 kV Substation Civil & Structural Engineering

Spennymoor is a 400 kV substation in the North East, connected by overhead lines to Stella West on Tyneside and Norton on Teesside. It is a strategic node on the regional network, with circuit upgrades planned to increase capacity. PCD provided civil and structural engineering for the 400 kV substation.

Cowley 400 kV Bay Extension steel gantries and supportsRepresentative image
/08Oxfordshire, UK

Cowley 400 kV Bay Extension

Power & Energy
Scope

Substation Bay Extension & Structural Engineering

/08Oxfordshire, UK

Cowley 400 kV Bay Extension

Substation Bay Extension & Structural Engineering

Cowley sits on the Cowley–Minety–Walham 400 kV overhead line, a key transmission route serving Oxfordshire. PCD delivered structural engineering for a bay extension at the substation, supporting new connections to the 400 kV network.

Burwell 400/132 kV Substation network stability equipmentRepresentative image
/09Cambridgeshire, UK

Burwell Substation

Power & Energy
Scope

400/132 kV Substation Civil Engineering & Technical Assurance

/09Cambridgeshire, UK

Burwell Substation

400/132 kV Substation Civil Engineering & Technical Assurance

Burwell Main is a 400/132 kV National Grid substation in East Cambridgeshire, linked to Pelham and Walpole. Recent works have extended the substation to add network stability equipment, supporting the integration of large-scale renewable generation. PCD provided civil engineering and technical assurance.

Wimbledon Substation London Power Tunnels shaft and headhouseRepresentative image
/10London, UK

Wimbledon (LPT2)

Power & Energy (LPT2)
Scope

400 kV Substation Civil Engineering & Shaft Foundations

/10London, UK

Wimbledon (LPT2)

400 kV Substation Civil Engineering & Shaft Foundations

Wimbledon is the western end of London Power Tunnels 2, a programme rewiring South London through deep cable tunnels. The site’s shaft is about 15 m across and 35 m deep, topped by a new headhouse for ventilation and tunnel access. PCD provided civil engineering and shaft foundation design for the 400 kV substation works.

New Cross Substation deep tunnel shaft constructionRepresentative image
/11London, UK

New Cross (LPT2)

Power & Energy (LPT2)
Scope

400 kV Substation Civil & Structural Engineering

/11London, UK

New Cross (LPT2)

400 kV Substation Civil & Structural Engineering

Cross substation in Southwark is a key node on London Power Tunnels 2. The new New Cross–Hurst circuit runs 18 km beneath South London in tunnels up to 50 m deep, and serves around 340,000 properties. PCD delivered civil and structural engineering for the 400 kV substation.

Hurst Substation eastern tunnel terminal and headhouseRepresentative image
/12Kent / South East London, UK

Hurst (LPT2)

Power & Energy (LPT2)
Scope

Substation Civil Engineering & Technical Assurance

/12Kent / South East London, UK

Hurst (LPT2)

Substation Civil Engineering & Technical Assurance

Hurst in Bexley is the eastern end of the LPT2 tunnel network. The site includes a shaft about 15 m wide and 35 m deep, with a new headhouse providing ventilation and permanent tunnel access. PCD provided civil engineering and technical assurance.

Showing 1–12 of 15 projects
Aerial view of reinforced concrete foundations on an excavated site
For Contact

Engineering experience for infrastructure that matters.

PCD supports complex power and infrastructure projects with specialist engineering capability, technical assurance and a practical understanding of project delivery.

Discuss a Project