
Experience across critical
power infrastructure.
Selected projects demonstrating PCD's experience across
major substation and infrastructure programmes.
Our Projects
Images shown are representative of each project type.
Representative imageLandulph 400 kV Substation
Power & EnergyLead Engineering: Civil, Structural & Design Assurance
Landulph 400 kV Substation
Lead Engineering: Civil, Structural & Design AssuranceLandulph is a National Grid substation where works form part of the ongoing expansion of the transmission network, upgrading the grid to support the UK’s shift to clean energy. PCD delivered the majority of the engineering works on the project, from civil engineering through to design assurance, reviewing design packages with site conditions in view to help keep the programme on track.
Representative imageNavenby 400 kV Substation
Power & EnergyLead Engineering: Civil, Structural & Design Assurance
Navenby 400 kV Substation
Lead Engineering: Civil, Structural & Design AssuranceThis new open-air 400 kV substation will help meet growing demand and connect new sources of cleaner power, as part of The Great Grid Upgrade. The scheme includes new access, drainage and landscaping, plus overhead line works terminating on gantries inside the substation. PCD delivered the majority of the engineering works on the project, from civil engineering through to design assurance.
Representative imageBicker Fen Substation
Power & Energy400 kV Substation Civil & Structural Engineering
Bicker Fen Substation
400 kV Substation Civil & Structural EngineeringNational Grid extended its Bicker Fen 400 kV substation to connect the Viking Link interconnector, a 1,400 MW link between the British and Danish transmission systems. The extension added double busbars, a bus coupler and two interconnector bays. PCD delivered civil and structural engineering for the 400 kV works.
Representative imageWest Burton Substation
Power & Energy400 kV Substation Civil Engineering & Foundations
West Burton Substation
400 kV Substation Civil Engineering & FoundationsWest Burton holds a notable place in UK grid history: the country’s first 400 kV line ran from West Burton power station to Sundon in Bedfordshire. Ongoing refurbishment of the surrounding network includes new underground cables and high-voltage connections at the substation. PCD provided civil engineering and foundation design for the 400 kV substation.
Representative imageWymondley Substation
Power & Energy400 kV GIS Substation Civil & Structural Engineering
Wymondley Substation
400 kV GIS Substation Civil & Structural EngineeringWymondley is a key National Grid substation in North Hertfordshire. As part of recent upgrade works, a 120-tonne transformer was moved across the site and positioned onto its final plinth. PCD delivered civil and structural engineering for the 400 kV GIS substation works.
Representative imageBulls Lodge 400 kV GIS Substation
Power & EnergyTemporary Works
Bulls Lodge 400 kV GIS Substation
Temporary WorksBulls Lodge is a substation extension featuring a GIS building and non-SF6 switchgear, connecting new solar generation to the 400 kV network. PCD provided temporary works engineering for the project, supporting safe construction of the GIS buildings and foundations.
Representative imageSpennymoor Substation
Power & Energy400 kV Substation Civil & Structural Engineering
Spennymoor Substation
400 kV Substation Civil & Structural EngineeringSpennymoor is a 400 kV substation in the North East, connected by overhead lines to Stella West on Tyneside and Norton on Teesside. It is a strategic node on the regional network, with circuit upgrades planned to increase capacity. PCD provided civil and structural engineering for the 400 kV substation.
Representative imageCowley 400 kV Bay Extension
Power & EnergySubstation Bay Extension & Structural Engineering
Cowley 400 kV Bay Extension
Substation Bay Extension & Structural EngineeringCowley sits on the Cowley–Minety–Walham 400 kV overhead line, a key transmission route serving Oxfordshire. PCD delivered structural engineering for a bay extension at the substation, supporting new connections to the 400 kV network.
Representative imageBurwell Substation
Power & Energy400/132 kV Substation Civil Engineering & Technical Assurance
Burwell Substation
400/132 kV Substation Civil Engineering & Technical AssuranceBurwell Main is a 400/132 kV National Grid substation in East Cambridgeshire, linked to Pelham and Walpole. Recent works have extended the substation to add network stability equipment, supporting the integration of large-scale renewable generation. PCD provided civil engineering and technical assurance.
Representative imageWimbledon (LPT2)
Power & Energy (LPT2)400 kV Substation Civil Engineering & Shaft Foundations
Wimbledon (LPT2)
400 kV Substation Civil Engineering & Shaft FoundationsWimbledon is the western end of London Power Tunnels 2, a programme rewiring South London through deep cable tunnels. The site’s shaft is about 15 m across and 35 m deep, topped by a new headhouse for ventilation and tunnel access. PCD provided civil engineering and shaft foundation design for the 400 kV substation works.
Representative imageNew Cross (LPT2)
Power & Energy (LPT2)400 kV Substation Civil & Structural Engineering
New Cross (LPT2)
400 kV Substation Civil & Structural EngineeringCross substation in Southwark is a key node on London Power Tunnels 2. The new New Cross–Hurst circuit runs 18 km beneath South London in tunnels up to 50 m deep, and serves around 340,000 properties. PCD delivered civil and structural engineering for the 400 kV substation.
Representative imageHurst (LPT2)
Power & Energy (LPT2)Substation Civil Engineering & Technical Assurance
Hurst (LPT2)
Substation Civil Engineering & Technical AssuranceHurst in Bexley is the eastern end of the LPT2 tunnel network. The site includes a shaft about 15 m wide and 35 m deep, with a new headhouse providing ventilation and permanent tunnel access. PCD provided civil engineering and technical assurance.

Engineering experience for infrastructure that matters.
PCD supports complex power and infrastructure projects with specialist engineering capability, technical assurance and a practical understanding of project delivery.
Discuss a Project
